
2017
This Project entailed the architectural and interior ergonomic design of the expansion and revamp of Saras’ Control Room, located in Sardinia’s south-west coast.

Our design met the facility’s need for blast resistance whilst providing a sleek, polished exterior, ensuring continuity with the surrounding industrial landscape. The Building’s exterior is characterised by a vast, curved shell, made with reinforced concrete and covered in stainless steel.